Georgia zoning / City of Gainesville / M-I
M-I Zoning in City of Gainesville, GA — Light Industrial
Dimensional standards not verified — confirm with planningM-I (Light Industrial) is a industrial zoning district in City of Gainesville, Georgia. It permits industrial, commercial by right. The district requires a 30,000 sq ft minimum lot, 40 ft front setbacks, building up to 50 ft (standards not verified — confirm with planning).
Permitted by right
Conditional / special permit
Not permitted
M-I district requirements(not verified — confirm with planning)
| Minimum lot size | 30,000 sq ft |
| Minimum lot width | 150 ft |
| Front setback | 40 ft |
| Side setback | 15 ft |
| Rear setback | 25 ft |
| Maximum height | 50 ft |
| Maximum stories | 3 |
| Maximum lot coverage | 60% |
Frequently asked questions
What is the minimum lot size in M-I zoning in City of Gainesville?
The minimum lot size in the M-I district is 30,000 sq ft (not verified — confirm with planning).
What are the setbacks for M-I in City of Gainesville?
M-I requires a 40 ft front setback, 15 ft side setback, and 25 ft rear setback (not verified — confirm with planning).
What can you build in M-I zoning in City of Gainesville?
Permitted uses in M-I include industrial, commercial. Conditional (special-permit) uses include office.
How tall can you build in M-I in City of Gainesville?
The maximum building height in M-I is 50 ft (not verified — confirm with planning).
Have a specific City of Gainesville property in mind?
Enter the address to see its district and exactly what you can build: verdict, site plan and application paperwork. Where Zonar has City of Gainesville's official zoning data the answer is instant; otherwise our AI looks for the local government's own zoning map and rules for you (usually about a minute — a new area can take a few — clearly labelled AI-estimated) and tells you plainly when it can't confirm the district.
Sources
Informational only — not legal or professional zoning advice. Ordinances change; verify with the City of Gainesville planning department before making purchase or construction decisions.