Georgia zoning / City of Gainesville / M-II
M-II Zoning in City of Gainesville, GA — Heavy Industrial
Dimensional standards not verified — confirm with planningM-II (Heavy Industrial) is a industrial zoning district in City of Gainesville, Georgia. It permits industrial by right. The district requires a 65,340 sq ft minimum lot, 50 ft front setbacks, building up to 60 ft (standards not verified — confirm with planning).
Permitted by right
Conditional / special permit
Not permitted
M-II district requirements(not verified — confirm with planning)
| Minimum lot size | 65,340 sq ft |
| Minimum lot width | 200 ft |
| Front setback | 50 ft |
| Side setback | 25 ft |
| Rear setback | 35 ft |
| Maximum height | 60 ft |
| Maximum stories | 4 |
| Maximum lot coverage | 50% |
Frequently asked questions
What is the minimum lot size in M-II zoning in City of Gainesville?
The minimum lot size in the M-II district is 65,340 sq ft (not verified — confirm with planning).
What are the setbacks for M-II in City of Gainesville?
M-II requires a 50 ft front setback, 25 ft side setback, and 35 ft rear setback (not verified — confirm with planning).
What can you build in M-II zoning in City of Gainesville?
Permitted uses in M-II include industrial. Conditional (special-permit) uses include commercial.
How tall can you build in M-II in City of Gainesville?
The maximum building height in M-II is 60 ft (not verified — confirm with planning).
Have a specific City of Gainesville property in mind?
Enter the address to see its district and exactly what you can build: verdict, site plan and application paperwork. Where Zonar has City of Gainesville's official zoning data the answer is instant; otherwise our AI looks for the local government's own zoning map and rules for you (usually about a minute — a new area can take a few — clearly labelled AI-estimated) and tells you plainly when it can't confirm the district.
Sources
Informational only — not legal or professional zoning advice. Ordinances change; verify with the City of Gainesville planning department before making purchase or construction decisions.