Georgia zoning / Hall County / AR
AR Zoning in Hall County, GA — Agricultural Residential
Dimensional standards not verified — confirm with planningAR (Agricultural Residential) is a residential zoning district in Hall County, Georgia. It permits single family by right. The district requires a 43,560 sq ft minimum lot, 50 ft front setbacks, building up to 35 ft (standards not verified — confirm with planning).
Permitted by right
Conditional / special permit
Not permitted
AR district requirements(not verified — confirm with planning)
| Minimum lot size | 43,560 sq ft |
| Minimum lot width | 150 ft |
| Front setback | 50 ft |
| Side setback | 15 ft |
| Rear setback | 40 ft |
| Maximum height | 35 ft |
| Maximum stories | 2 |
| Maximum floor area ratio (FAR) | 0.25 |
| Maximum lot coverage | 25% |
Frequently asked questions
What is the minimum lot size in AR zoning in Hall County?
The minimum lot size in the AR district is 43,560 sq ft (not verified — confirm with planning).
What are the setbacks for AR in Hall County?
AR requires a 50 ft front setback, 15 ft side setback, and 40 ft rear setback (not verified — confirm with planning).
What can you build in AR zoning in Hall County?
Permitted uses in AR include single family. Conditional (special-permit) uses include adu, duplex.
How tall can you build in AR in Hall County?
The maximum building height in AR is 35 ft (not verified — confirm with planning).
Have a specific Hall County property in mind?
Enter the address to see its district and exactly what you can build: verdict, site plan and application paperwork. Where Zonar has Hall County's official zoning data the answer is instant; otherwise our AI looks for the local government's own zoning map and rules for you (usually about a minute — a new area can take a few — clearly labelled AI-estimated) and tells you plainly when it can't confirm the district.
Sources
Informational only — not legal or professional zoning advice. Ordinances change; verify with the Hall County planning department before making purchase or construction decisions.