Georgia zoning / Hall County / I-2

I-2 Zoning in Hall County, GA — Heavy Industrial

Dimensional standards not verified — confirm with planning

I-2 (Heavy Industrial) is a industrial zoning district in Hall County, Georgia. It permits industrial by right. The district requires a 87,120 sq ft minimum lot, 60 ft front setbacks, building up to 60 ft (standards not verified — confirm with planning).

Permitted by right

industrial

Conditional / special permit

commercial

Not permitted

Any use not listed as permitted or conditional

I-2 district requirements(not verified — confirm with planning)

Minimum lot size87,120 sq ft
Minimum lot width200 ft
Front setback60 ft
Side setback30 ft
Rear setback40 ft
Maximum height60 ft
Maximum stories4
Maximum floor area ratio (FAR)0.5
Maximum lot coverage50%

Frequently asked questions

What is the minimum lot size in I-2 zoning in Hall County?

The minimum lot size in the I-2 district is 87,120 sq ft (not verified — confirm with planning).

What are the setbacks for I-2 in Hall County?

I-2 requires a 60 ft front setback, 30 ft side setback, and 40 ft rear setback (not verified — confirm with planning).

What can you build in I-2 zoning in Hall County?

Permitted uses in I-2 include industrial. Conditional (special-permit) uses include commercial.

How tall can you build in I-2 in Hall County?

The maximum building height in I-2 is 60 ft (not verified — confirm with planning).

Have a specific Hall County property in mind?

Enter the address to see its district and exactly what you can build: verdict, site plan and application paperwork. Where Zonar has Hall County's official zoning data the answer is instant; otherwise our AI looks for the local government's own zoning map and rules for you (usually about a minute — a new area can take a few — clearly labelled AI-estimated) and tells you plainly when it can't confirm the district.

Or run a free zoning check on the homepage →

Sources

Informational only — not legal or professional zoning advice. Ordinances change; verify with the Hall County planning department before making purchase or construction decisions.